The last couple of weeks have been pretty packed with various activities for the two of us and I finally manage to find time to update our blog.

In the last two weeks, we have finished up the marble flooring, after a lot of pain and anguish (not kidding), and the lighting started, followed closely by the carpentary.

The painting work was done up reasonably fast, though there will be another round of touch up towards the end of the project. We had earlier chosen the colors over the weekend and have the color plan below. The effect of the paint job was quite siginificant in the sense that it completely changed the look and feel of the place (the old orange walls were gruesome to say the least).

By the time we found time to check out the paint job, parts of the lightings were already fixed up, and that really made the place look more spacious and clean. My favourite area then was probably the balcony. The light we chose matched the chengai decking perfectingly, and created a really cosy atmosphere at the area we planned to use for chilling out and relaxing after a long day's work.

Paint Plan

Painting Process
MBR Wall
Study Room

I like the look, and all that's left here is the Chengai sanding.

So far so good as far as the painting is concerned, though there is still much to worry about with regards to my flooring. Hopefully we can get that sorted out soon and I can then post pictures of that up here.

Will be posting carpentary pictures up soon, so watch this space.